by CDB Arquitectura | Jul 24, 2022 | News
The facade In this phase of the construction works of the CAP, the installation of the vertical stone slats that make up the façade and that will provide the building with protection against the sun is carried out. The composition of the facade, although it is...
by CDB Arquitectura | May 13, 2022 | News
During this month, the expansion works begin, which will add an area of 1,560 m² to the hospital complex. A proposal that respects the original project With the aim of achieving an extension that does not change or contrast with the current situation, the proposed...
by CDB Arquitectura | Aug 2, 2021 | News
Vidresif publishes on its website the EADA façade project designed by the architects Humbert Costas and Carlos Durán View...
by CDB Arquitectura | Aug 2, 2021 | News
The winning project of the new CAP in La Llagosta has based its proposal on the interaction with the urban space and the environment of the building, as well as the creation of a backbone interior patio that distributes and organizes the rooms and interior...
by CDB Arquitectura | Jul 19, 2021 | News
The EADA Business School project has been published in number 38 of AFL magazine, Arquitectura en Fachadas Ligeras. This article describes the particularities of the project and details the façade more specifically, highlighting its identity, chromaticism, its...
by CDB Arquitectura | Jul 19, 2021 | News
At the beginning of April, the works on 80 Casp Street finished, concluding with a new floor, with 4 apartments and 2 offices, crowning the Eixample building. The project carried out has been based on the original building respect, using modules and industrialized...