Health Care Area Pedraforca Building

Technical data

Intervention level: Scheme Design, Detail Design and Site Supervision.
Client: Catalan Health Service, Government of Catalonia.
Location: Barcelona
Project year: 2002
Construction period: 2002-2003.
Total built: 3.118,77 m²
Budget: 2.635.82,57 €
Construction company: PREUFET
Other technical:

  • Collaboration with *
  • Josep M. Oller, Enric Peña, riggers.
  • Serra Campmany, installations consultancy.
  • Sala consultors, architect, structures consultancy.
Description

This building responds both to model service centers defined by the Catalan Health Service of the Generalitat of Catalonia, as the urban conditions, technical and program management available PSPV.

The building is the first of the buildings, four in total, the Special Plan available here giving Avenue facade Military Hospital and maintains alignment and volumetric characteristics defined by regulations of the same, as well as guidelines that the City Council has seen fit to establish here.

A sharp geometry without protruding bodies, defined thus by the gauges and parameters from the rules, but also for the own needs of the center, offers a unified, clear and closed. The main entrance to the building is through the closest point to the current access enclosure, offering thus justification flows itineraries final movement of the entire area of intervention called Pere Virgili Health Park.

We use cookies to improve our services. If you go on surfing, we will consider you accepting its use. More information here

The cookie options on this website are configured to "allow cookies" to offer you a better browsing experience. If you continue to use this website without changing your options or click "OK" you will be consenting to the cookies on this site.

Close