Horta House in Blanes
Technical data
Intervention level: Scheme Design, Detail Design and Site Supervision.
Client: Dumaxon.
Location: Girona
Project year: 1999
Construction period: 1999 – 2000
Total built: 477 m²
Budget: 365.395,79 €
Construction company: EOTALGRUP
Other technical:
- Collaboration with *
- Josep M. Oller, Enric Peña, technical architects.
- Manuel Comas, engineer, installations consultancy.
- Manuel Arguijo, architect, structures consultancy.
Description
No description