Joan Montllor Primary School
Technical data
Intervention level: Scheme Design, Detail Design and Site Supervision
Client: Gisa, Department of Education, Government of Catalonia
Location: Sabadell, Barcelona
Project year: 2007
Construction period: Beginning 2015.
Total built: 2.555.46 m²
Budget: 3.846.764’60 €
Other technical:
- Collaboration with *.
- Xavier Aumedes, technical architect, economic consultancy.
- Manuel Comas, industrial engineer, installations consultancy.
- Miquel Angel Sala, architect. Structures consultancy.
Description
The reform, upgrading and expansion of the school intends to eliminate its current dispersed nature. We propose to preserve only the main body, extending its two sides and forming a U-shaped volume.
This provision volume, gives the future reform and expansion of the teaching equipment, extensive visual domains on one’s environment, inner courtyard, while complementarity with neighboring urban areas, Karl Marx Square and Square Cardener thus providing ideal conditions for education.